Skip to Content

New House building

  • strict warning: Non-static method view::load() should not be called statically in /home3/annchap/public_html/sites/all/modules/views/views.module on line 879.
  • strict warning: Declaration of views_handler_filter::options_validate() should be compatible with views_handler::options_validate($form, &$form_state) in /home3/annchap/public_html/sites/all/modules/views/handlers/views_handler_filter.inc on line 0.
  • strict warning: Declaration of views_handler_filter::options_submit() should be compatible with views_handler::options_submit($form, &$form_state) in /home3/annchap/public_html/sites/all/modules/views/handlers/views_handler_filter.inc on line 0.
  • strict warning: Declaration of views_handler_filter_boolean_operator::value_validate() should be compatible with views_handler_filter::value_validate($form, &$form_state) in /home3/annchap/public_html/sites/all/modules/views/handlers/views_handler_filter_boolean_operator.inc on line 0.
  • strict warning: Declaration of views_plugin_style_default::options() should be compatible with views_object::options() in /home3/annchap/public_html/sites/all/modules/views/plugins/views_plugin_style_default.inc on line 0.
  • strict warning: Declaration of views_plugin_row::options_validate() should be compatible with views_plugin::options_validate(&$form, &$form_state) in /home3/annchap/public_html/sites/all/modules/views/plugins/views_plugin_row.inc on line 0.
  • strict warning: Declaration of views_plugin_row::options_submit() should be compatible with views_plugin::options_submit(&$form, &$form_state) in /home3/annchap/public_html/sites/all/modules/views/plugins/views_plugin_row.inc on line 0.
  • strict warning: Non-static method view::load() should not be called statically in /home3/annchap/public_html/sites/all/modules/views/views.module on line 879.
  • strict warning: Non-static method view::load() should not be called statically in /home3/annchap/public_html/sites/all/modules/views/views.module on line 879.

We are now 4 weeks into our new house build. This is an exciting time for us. We have always lived in old houses - coped with the dust and the chills of draughty hallways and leaking windows and doors. Enough I cried. I want to live in a smaller, warmer home. Osneloc House which we loved for its history grace and charm had 5 bedrooms, 14 ft ceiling studs and over half an acre of garden. floor being finished

We are building an enegy efficient house - double galzing, double insulation, polished concrete floor as a heat source, photovoltaic cells for electricity and a wetback fire for the winter. Two bedrooms and a study and large open plan living space. Framing is up and roof on next week. In by mid November. And gardens to be planned with a raised vege bed along the back wall.  It is U shaped with large inner patio. framing up

Comments

Post new comment

By submitting this form, you accept the Mollom privacy policy.